EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2011
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2010
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2009
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2008
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2007
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2006
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2005
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2004
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2003
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2002
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2001
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
2000
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
1999
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
1998
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
1997
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------

top
1996
Survey form view entire document:  text  image
EM16
====

[PERSON'S FIRST MIDDLE AND LAST NAME] [EMPLOYER BEING ASKED ABOUT....] [STR-DT]
When did (PERSON) start working at that job?
[Enter Year-2] ........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
IF YEAR IS REFERENCE YEAR, CONTINUE WITH EM16OV1
----------------------------------------------------
----------------------------------------------------
IF YEAR IS REFERENCE YEAR MINUS 1, GO TO EM16OV2
----------------------------------------------------
----------------------------------------------------
OTHERWISE, GO TO EM17
----------------------------------------------------
EM16OV1
=======

[Enter Month-2, Day-2]................. [EM17]
REF ................................... -7 [EM17]
DK .................................... -8 [EM17]
EM16OV2
=======

[Enter Month-2]........................
REF ................................... -7
DK .................................... -8
----------------------------------------------------
EDIT/RANGE CHECK:

ENTRIES FOR MONTH AND DAY FIELDS MUST CORRESPOND TO CALENDAR MONTHS AND DAYS. THAT IS,
- IF MONTH, ALLOWABLE VALUES = 01 - 12.
- IF DAY:
- ALLOWABLE VALUES = 01 - 31 IF MONTH CODED '01', '03', '05', '07', '08', '10', '12';
- ALLOWABLE VALUES = 01 - 30 IF MONTH CODED '04', '06', '09', '11';
- ALLOWABLE VALUES = 01 - 29 IF MONTH CODED '02' AND YEAR IS 1996 (LEAP YEAR);
- ALLOWABLE VALUES = 01 - 28 IF MONTH CODED '02' AND YEAR IS NOT 1996 (I.E., NOT LEAP YEAR).

MISSING VALUES = -7 AND -8 ALLOWED FOR MONTH AND DAY FIELDS.
----------------------------------------------------
----------------------------------------------------
EDIT: JOB START DATE MUST BE = OR ) THAN THE PERSON'S DATE OF BIRTH + 12 YEARS AND ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON. IF A DATE OF BIRTH IS NOT AVAILABLE, THAN JOB START DATE MUST BE ( OR = THE REFERENCE PERIOD END DATE FOR THIS PERSON.
----------------------------------------------------